Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
28 July 2025
ASX: OD6
Quarterly Activities and Cashflow Report
OD6 Metals Limited (OD6 or the Company) is pleased to present its Quarterly
Activities and Cashflow Report for the period ending 30 June 2025
Highlights (including subsequent events):
Gulf Creek Copper Project, NSW
â˘
Maiden Drill program intercepted massive sulphide zones and extends copper mineralisation beneath
historic workings
â˘
High Grade Drill results confirmed historically mined mineralisation from surface and steeply dipping to
the northwest associated with massive to semi-massive sulphide including:
â
8m @ 1.41% Copper, 1.26% Zinc and 7.08g/t Silver in hole GCC0004 from 108m including:
âŞ
5m @ 2.13% Copper, 1.82% Zinc, 10.74g/t Silver from 109m down hole
â
6m @ 1.32% Copper, 2.82% Zinc and 9.02g/t Silver in hole GCC0006 from 116m
â
1m @ 4.33% Copper, 1.02% Zinc and 2.5g/t Silver in hole GCC0001 from 67m (hole ended
early due to the need to convert from RC to a diamond core tail which was unable to be
undertaken)
â˘
Strong relationship between magnetism and massive sulphide mineralisation suggests potential
large scale VMS system at Gulf Creek, with best intersections returned when targeting peak
magnetic body
â˘
Magnetic modelling confirms potential repeat extensional target structures along strike, including the
large Big Bend, Eastern Limb and Northwestern Zones as well as regional targets
â˘
18 RC and diamond drill holes approved totalling ~5,000m for Phase 2 drill campaign targeting
the previously untested prospects include North West and West Limb
â˘
A Further 7 RC and Diamond drill holes approved totalling ~2,500m targeting the potential
repeat structure at Big Bend plus follow up deep drilling proximal to the recent maiden program
which targeted the historical mining area
â˘
The repeat structures represent a portion of >3km of untested strike in immediate minestratigraphy
â˘
NSW Resource Regulator Investigation finalised with matter now closed.
Splinter Rock, WA
â˘
The Company was please to present an advanced Geological Research Paper that was peer reviewed and
recently published in the international scientific journal, Ore Geology Reviews
â˘
Phase 4 ANSTO Metallurgical Tests at the Splinter Rock Project continued during the quarter
Corporate
â˘
$1.17M placement completed
â˘
Cash balance at the end of the June quarter remains strong at A$1.09M
1
Brett Hazelden, Managing Director, commented:
âThe high-grade assay results from the Gulf Creek Maiden Drilling Program was a highlight for the quarter, whic h
aligned well with the historic workings and the zones of massive to semi-massive sulphides. Most importantly we
have confirmed the strong relationship between magnetism, mineralisation and classic VMS stratigraphy. The fact
that the high-grade mineralisation is sitting immediately in the hanging wall of the strongest magnetic body
confirms the Companyâs targeting methodology.
OD6 is now able to focus on the potential repeat extensional target structures along strike, including the large Big
Bend, Eastern Limb and Northwestern Zones as well follow up deep drilling below the old workings. With twentyfive RC and diamond drilling holes newly approved this quarter, totalling ~7,500m, we are now well positioned to
progress these previously untested areas.
It is also pleasing to have quickly resolved the NSW Resource Regulator Investigation with the matter now being
closed. Notably we were still able to obtain new approvals and recommence exploration activities during this period.
The Rare Earth sector continues to attract attention with major global announcement by governments and prices
continuing to improve. OD6 in conjunction with ANSTO have continued to optimise the metallurgical impurity
removal process which continues to have positive outcomes with multiple potential pathways being finalised. Results
are due to be announced this current quarter. â
Exploration and Development (including subsequent events)
High-Grade
During the quarter (refer ASX release 7 May 2025), OD6 reported high copper drill results
Copper Drill
from its Maiden Drilling program at the Gulf Creek Copper Project.
Results
The drill program was focused on the historic workings and aimed to test the continuity of
the known high-grade mineralisation and VMS structures.
The program completed 1,113m across 6 drill holes prior to the programmed being ceased
early as directed by the NSW Resource Regulator.
Key Highlights included:
â˘
High Grade Drill results confirm historically mined mineralisation from surface and
steeply dipping to the northwest associated with massive to semi-massive sulphide
including:
o
8m @ 1.41% Copper, 1.26% Zinc and 7.08g/t Silver in hole GCC0004
from 108m including:
âŞ
5m @ 2.13% Copper, 1.82% Zinc, 10.74g/t Silver from 109m down
hole
o
6m @ 1.32% Copper, 2.82% Zinc and 9.02g/t Silver in hole GCC0006
from 116m
o
1m @ 4.33% Copper, 1.02% Zinc and 2.5g/t Silver in hole GCC0001 from
67m (hole ended early due to the need to convert from RC to a diamond
core tail which was unable to be undertaken)
â˘
Strong relationship between magnetism and massive sulphide mineralisation
suggests potential large scale VMS system at Gulf Creek, with best intersections
returned when targeting peak magnetic body
2
â˘
Positively, the drilling in holes GCC0003, GCC0004, GCC0005 and GCC0006 also
intersected sediment hosted broad zones of highly anomalous copper in the near
surface including;
â˘
o
29m @ 0.16% Copper in hole GCC0004 from 3m
o
19m @ 0.13% Copper in hole GCC0005 from surface
o
15m @ 0.15% Copper in hole GCC0003 from 4m
o
5m @ 0.28% Copper in hole GCC0006 from 0m
The presence of broad, albeit low-grade, intersections is encouraging and indicative
of multiple phases of mineralisation and is suggesting potential of a much larger
system and the need for extensional exploration.
â˘
Magnetic modelling confirms potential repeat extensional target structures along
strike, including the large Big Bend, Eastern Limb and Northwestern Zones
â˘
The presence of the jaspilite capping the mineral system, and the strong magnetism
in the footwall of mineralisation indicates that the Big Bend, West Limb and
Northwestern Zones remain excellent untested targets. The observations from the
drilling completed to date are consistent with a âBesshiâ volcanic hosted massive
sulphide (VMS) system, which are known to occur in clusters.:
o
Big Bend â strong magnetism, surface jaspilites, increased IP geophysics
effect, surface anomalism in Cu-Ce
o
West Limb Target 2 â strong magnetism, surface jaspilites, surface
anomalism in Cu-Ce
o
Northwestern Target â strong magnetism, surface jaspilites, surface
anomalism in Cu-Co-Ag-Be-Ce-Zn
Figure 1: Chip Trays from Hole GC0004 showing the classic VMS stratigraphic succession from hanging wall sediments, jaspilite,
disseminate to semi massive to massive sulphides to footwall basalts
3
Figure 2: Plan view of preliminary results
Figure 3: Long section view SW showing increased grade and width with magnetic bodies.
Refer to announcement dated 14 November 2024 for further details on geophysical modelling.
4
Figure 4: Cross-section through hole GCC0004
5
Figure 6: Long Section view to SW showing extended view of geophysical modelling and the targets along the West Limb of the Gulf
Creek Syncline to the NW anomaly. Refer to announcement dated 14 November 2024 for details on geophysical modelling.
Phase 2 Drilling
During the quarter the Company received two new Phase 2 drilling Approvals from the NSW
Approved at
Resource Regulator (refer ASX releases 22 May 2025 and 11 June 2025). The two approvals
Gulf Creek
include
â˘
18 RC and diamond drill holes totalling ~5,000m targeting the previously untested
prospects include North West and West Limb
â˘
7 RC and Diamond drill holes totalling ~2,500m targeting the potential repeat
structure at Big Bend plus follow up deep drilling proximal to the recent successful
maiden 6-hole Phase 1 program which targeted the historical mining area
â˘
Phase 2 drilling is focused on potential repeat structures identified by magnetic
modelling driven by the strong relationship between magnetism and massive
sulphides
â˘
The repeat structures represent a portion of >3km of untested strike in immediate
mine-stratigraphy
â˘
Historically, Gulf Creek was one of Australiaâs highest-grade copper-zinc mines
6
Finalisation of
Subsequent to the end of the (refer ASX release 10 July 2025) the Company confirmed the
NSW Resources
finalisation of the NSW Resources Regulator investigation in connection with the Gulf Creek
Regulator
Copper Project.
Investigation
The Regulator determined that a number of official cautions and penalty notices were
appropriate in relation to the alleged offences by the Companyâs wholly owned subsidiary
Gulf Creek Copper Pty Ltd (Gulf Creek Copper), with a total penalty of $7,500 payable.
Pursuant to section 378K of the Mining Act, by making payment of the penalty prescribed,
Gulf Creek Copper will not be liable to any further proceedings. The Company has made
payment of the amounts specified and the Company considers the Regulatorâs investigation
concluded.
Splinter Rock-
Phase 4 metallurgical testing continued at ANSTO during the quarter. The focus of the
Phase 4 ANSTO
works is summarised below and is largely now focused on samples originating from
Rare Earth
multiple holes at Inside Centre and Prop, based on heap leach liquors.
Metallurgical
Tests Ongoing
â˘
Impurity Removal Trials: Conduct impurity removal trials under various pH
conditions, temperatures, and with different reagents.
â˘
Assessment of Resin Use: Evaluate the potential use of resins in both pulp and liquid
phases to assist in impurity removal.
â˘
Ion Exchange Assessment: Assess ion exchange processes on "leach" liquor and
investigate selective elution of REE versus impurities such as Al and Fe.
â˘
Nanofiltration Evaluation: Evaluate nanofiltration processes to produce a retentate
with increased REE concentration and a permeate containing clean acid for recycling.
â˘
Mixed Rare Earth Precipitation: Investigate mixed rare earth precipitation methods,
including carbonates and hydroxides.
Advanced
â˘
The Paper entitled, âUnsupervised geochemical characterisation of deeply weathered
Geological
terrains and regolith-hosted REE deposits: Rationale and benefits for explorationâ has
Research Paper
been compiled by lead author Tobias Bamforth who is a Postdoctoral Research
Fellow, Monash University
â˘
The Paper has utilised the last 3 years of geological research undertaken by CSIRO,
Murdoch University, Monash University, James Cook Universityâs and OD6 Metals at
the Splinter Rock Rare Earth Project, all of whom have representatives as co -authors
â˘
In simple terms the research paper explains how statistical methods may expedite
the characterisation of regolith samples across large, buried regolith hosted
mineralised formations
â˘
At Splinter Rock, the process identified and mapped two regolith horizon groups:
one generally unmineralised transported sediment group, which sits above a
mineralised saprolite-saprock group. These two horizon groups were then further
separated into five laterally consistent regolith horizons, which the paper delves into
in considerable detail
â˘
OD6 to prioritise the two mineralised saprolite-saprock horizons that represent
superior project economics. Value is driven by these being near surface and with
extensive thickness.
7
â˘
These two mineralised horizons have also shown to have the best metallurgical
outcomes, which further assists in geo-metallurgical targeting of priority future
development areas.
â˘
Notably the high grade Inside Centre Prospect is a clear standout from these
investigations and already consists of an Indicated Resource of 119Mt @ 1,632ppm
TREO
Corporate
General
Meeting
OD6 Metals held a General Meeting (GM) of shareholders on 9 April 2025.
Please refer to the following ASX Announcements:
â˘
Results of Meeting, 9 April 2025
â˘
Notice of Meeting, 4 March 2025
Change of
OD6 advised that the Company has changed its register address to Level 1, 1 Alvan Street,
Company
Subiaco, WA 6008 (Refer ASX Release 26 May 2025). The Companyâs contact telephone
Address
number is unchanged.
Cash Holdings
The Company had A$1.09M million of cash on hand as at 30 June 2025
Securities on
Fully Paid Ordinary Shares
Issue
160,467,950 (as at 30 June 2025)
Performance rights
OPTIONS
1,300,000
61,339,251
Options on issue comprise:
â˘
22,050,371 Founder Options exercisable at A$0.30 on or before 31 October 2025.
â˘
3,850,000 Incentive Options exercisable at A$0.30 on or before 31 March 2026.
â˘
1,500,000 Performance Options exercisable at A$0.50 on or before 31 March 2026.
â˘
900,000 Performance Options exercisable at A$0.30 on or before 09 October 2026
â˘
2,650,000 Incentive Options exercisable at A$0.27 on or before 08 December 2026.
â˘
5,000,000 Broker Options exercisable at A$0.114 on or before 9 May 2027.
â˘
4,500,000 New Chair Options exercisable at $0.10 on or before 5 December 2027
â˘
12,888,880 Free attached Options exercisable at A$0.065 on or before 7 May 2028
â˘
8,000,000 Broker Options exercisable at A$0.065 on or before 7 May 2028
At 30 June 2025 none of the performance milestones of the Performance Rights still on
issue have been met, nor had any shares been issued on conversion of Performance Rights.
8
A summary of the performance milestones is outlined below:
Borrowings
CLASS
NUMBER
MILESTONE
EXPIRY DATE
C
1,000,000
The Company announcing to ASX a JORC Code Compliant
inferred (or greater) Mineral Resource (as defined in the
JORC Code) of not less than 1,000,000,000 tonnes (of which
at least 400,000,000 tonnes must be an indicated Mineral
Resource), grading a minimum of 1000 ppm total rare earth
oxides (TREO).
08 December
2026
D
300,000
The rights vest on the Company announcing to ASX the
results of a Scoping Study (as defined in the JORC Code)
showing the potential to generate an internal rate of return
(IRR) of more than 20% using consensus prices and Board
approved assumptions.
08 December
2026
The Company has no borrowings.
Expenditure
Exploration
Exploration and Evaluation expenditure during the quarter was A$586k. Expenditure
Expenditure
included site visits, drilling activities, assays, ANSTO metallurgical testing, mineralogy and
geological investigation.
Related Party
During the quarter ended 30 June 2025 payments to related parties amounted to A$151k,
Transactions
comprising of Managing Director Fees, Non-Executive Director fees, Superannuation and
geological consulting fees to GeoSpy Pty Ltd, which is an entity controlled by Darren
Holden.
Mineral Interests
Exploration
During the quarter OD6 acquired the license (EL 8492) over the historic Gulf Creek Copper
Tenements
mine and its surrounding area, in NSW.
Schedule of Exploration Licenses (E) held end of June 2025 Quarter.
PROJECT
TENEMENT
NUMBER
HOLDER
STATUS
GRANTED
OWNERSHIP
Gulf Creek
EL 8492
Gulf Creek Copper Pty Ltd
Granted
7 Jan 25
100%
Splinter Rock
E 63/2115
Odette Six Pty Ltd
Granted
4 Feb 22
100%
Splinter Rock
E 69/3904
Odette Six Pty Ltd
Granted 15 Feb 22
100%
Splinter Rock
E 69/3905
Odette Six Pty Ltd
Granted 15 Feb 22
100%
Splinter Rock
E 69/3907
Odette Six Pty Ltd
Granted 14 Feb 22
100%
Splinter Rock
E 69/3893
Odette Six Pty Ltd
Granted
20 Jan 22
100%
Splinter Rock
E 69/3894
Odette Six Pty Ltd
Granted
20 Jan 22
100%
9
ASX Announcements (including Subsequent Events)
This Quarterly Activities Report contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the âAustralasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reservesâ (2012 JORC Code). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the
following announcements lodged on the ASX:
10/07/2025 Finalisation of NSW Resources Regulator Investigation
08/05/2025 Change of Directors Interest Notices
07/05/2025 Notification of Cessation of Securities â OD6
11/06/2025 Second Approval Received for Phase 2 Drilling at Gulf Creek
26/05/2025 Change of Company Address
22/05/2025 Phase 2 Drilling at Gulf Creek Copper Project Approved
08/05/2025 Change of Directors Interest Notices
07/05/2025 Cleansing Notice
07/05/2025 Notification Regarding Unquoted Securities â OD6
07/05/2025 Notification Regarding Unquoted Securities â OD6
07/05/2025 High-Grade Copper Massive Sulphides at Gulf Creek
05/05/2025 Gulf Creek Exploration Set to Recommence
01/05/2025 Advanced Geological Research Paper Publication
29/04/2025 Quarterly Activities/Appendix 5B Cash Flow Report
24/04/2025 Notification of Cessation of Securities â OD6
09/04/2025 Results of Meeting
These announcements are available for viewing on the Companyâs website https://www.od6metals.com.au/.
OD6 confirms that it is not aware of any new information or data that materially affects the information
included in any original ASX announcement.
10
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to
be forecasts, forward looking statements, or statements about the future matters for the purposes of the
Corporations Act or any other applicable law. Statements regarding plans with respect to OD6 Metals projects
are forward looking statements and can generally be identified by the use of words such as âprojectâ, âforeseeâ,
âplanâ, âexpectâ, âaimâ, âintendâ, âanticipateâ, âbelieveâ, âestimateâ, âmayâ, âshouldâ, âwillâ or similar expressions. There
can be no assurance that the OD6 Metals plans for its projects will proceed as expected and there can be no
assurance of future events which are subject to risk, uncertainties and other actions that may c ause OD6 Metals
actual results, performance, or achievements to differ from those referred to in this document. While the
information contained in this document has been prepared in good faith, there can be given no assurance or
guarantee that the occurrence of these events referred to in the document will occur as contemplated.
Accordingly, to the maximum extent permitted by law, OD6 Metals and any of its affiliates and their directors,
officers, employees, agents and advisors disclaim any liability whether direct or indirect, express or limited,
contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward -looking statement or any event or
results expressed or implied in any forward-looking statement; and do not make any representation or warranty,
express or implied, as to the accuracy, reliability or completeness of the information in this document, or
likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any
forward-looking statement; and disclaim all responsibility and liability for these forward -looking statements
(including, without limitation, liability for negligence).
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which
have been cross-referenced to previous market announcements made by the Company. The Company confirms
that it is not aware of any new information or data that materially affects the information included in the
relevant market announcements.
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is extracted
from the Companyâs ASX announcements dated 18 July 2024. OD6 confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply.
This announcement has been authorised for release by the Board of OD6 Metals Limited
11
About OD6 Metals
OD6 Metals is an Australian public company pursuing exploration and development opportunities within the critical mineral s
sector, namely rare earths and copper.
Copper
The Company is advancing the recently acquired Gulf Creek Copper-Zinc VMS Project located near the town of Barraba in
NSW, Australia.
Gulf Creek was mined at around the turn of the 20th century and was once regarded as the highest grade copper mine (2%
to 6.5% Cu) in NSW until its closure due to weak copper prices in 1912. Very little exploration has occurred at the project i n
over 100 years, with OD6 aiming to apply modern day exploration technologies.
Mineralisation is associated with magnetite, with geophysics showing significant greenfields and brownfields exploration
potential exists with over >3km of untested strike in the immediate mine-stratigraphy, and over >10km across the tenement.
Rare Earth Elements
OD6 Metals has successfully identified clay hosted rare earths at its 100% owned Splinter Rock Project which is located in
the Esperance-Goldfields region of Western Australia.
The Company released a Mineral Resource Estimate (MRE) for Splinter Rock in May 2024, confirming that the project hosts
on of the largest and highest-grade clay-hosted rare earths deposit in Australia with an Indicated Resource of 119Mt @
1,632ppm TREO and an Inferred Resource of 563Mt @ 1,275ppm TREO with an overall ratio of ~23% high -value Magnetic
Rare Earths (MagREE).
OD6 Metals believes that Splinter Rock has all the hallmarks of a world class rare earths project with a conceptual
development which utilises the large and high-grade Splinter Rock resource to support a long-life REE operation supported
by a low strip ratio
Corporate Directory
Managing Director
Non-Executive Chairman
Mr Brett Hazelden
Dr Darren Holden
Non-Executive Director
Non-Executive Director
Mr Piers Lewis
Dr Mitch Loan
Financial Controller/ Joint Company Secretary
Joint Company Secretary
Mr Troy Cavanagh
Mr Joel Ives
Contact
Investor Relations
OD6 Metals Ltd
ACN 654 839 602
Lucas Robinson
Corporate Storytime
www.od6metals.com.au
Mail to: info@od6metals.com.au
lucas@corporatestorytime.com
Phone: +61 408 228 889
Phone: +61 8 6189 8515
Level 1, 1 Alvan Street, Subiaco, WA 6008
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
OD6 Metals Limited
ABN
Quarter ended (âcurrent quarterâ)
34 654 839 602
30 June 2025
Consolidated statement of cash flows
Current quarter
$Aâ000
1.
Cash flows from operating activities
1.1
Receipts f rom customers
1.2
Payments f or
Year to date
(12 months)
$Aâ000
-
-
(a) exploration & evaluation
-
(175)
(b) development
-
-
(c) production
-
-
(d) staf f costs
(87)
(382)
(e) administration and corporate costs
(140)
(753)
-
-
11
58
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of f inance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (ref und of tenement application f ees)
-
31
1.9
Net cash from / (used in) operating
activities
(216)
(1,221)
2.
Cash flows from investing activities
2.1
Payments to acquire or f or:
-
-
(9)
(276)
-
(2)
(576)
(1,347)
(e) investments
-
-
(f )
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$Aâ000
Year to date
(12 months)
$Aâ000
Proceeds f rom the disposal of :
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash f lows f rom loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (R&D Tax ref und and Government
grants)
-
620
2.6
Net cash from / (used in) investing
activities
(585)
(1,005)
3.
Cash flows from financing activities
3.1
Proceeds f rom issues of equity securities
(excluding convertible debt securities)
55
1,160
3.2
Proceeds f rom issue of convertible debt
securities
-
-
3.3
Proceeds f rom exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(25)
(170)
3.5
Proceeds f rom borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
30
990
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,861
2,325
4.2
Net cash f rom / (used in) operating
activities (item 1.9 above)
(216)
(1,221)
4.3
Net cash f rom / (used in) investing activities
(item 2.6 above)
(586)
(1,005)
4.4
Net cash f rom / (used in) f inancing activities
(item 3.10 above)
30
990
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Ef f ect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$Aâ000
Year to date
(12 months)
$Aâ000
-
-
1,089
1,089
Current quarter
$Aâ000
Previous quarter
$Aâ000
at the end of the quarter (as shown in the
consolidated statement of cash f lows) to the
related items in the accounts
5.1
Bank balances
1,089
1,861
5.2
Call deposits
-
-
5.3
Bank overdraf ts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,089
1,861
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
86
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
65
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Total facility
amount at quarter
end
$Aâ000
Amount drawn at
quarter end
$Aâ000
7.1
Loan f acilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specif y)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each f acility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional f inancing
f acilities have been entered into or are proposed to be entered into af ter quarter end,
include a note providing details of those f acilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash f rom / (used in) operating activities (item 1.9)
(216)
8.2
(Payments f or exploration & evaluation classif ied as investing
activities) (item 2.1(d))
(576)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(792)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,089
8.5
Unused f inance f acilities available at quarter end (item 7.5)
8.6
Total available f unding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
Note: the term âfacilityâ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
-
$Aâ000
1,089
1.4
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as âN/Aâ.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the f ollowing questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash f lows f or the time being and, if not, why not?
Answer: No. The Company notes that the June quarter cash spend was largely f or the
completion of the drilling at Gulf Creek. The Companyâs will continue to closely
monitor its available cash and may reduce operating and exploration expenditure
accordingly.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise f urther
cash to f und its operations and, if so, what are those steps and how likely does it
believe that they will be successf ul?
Answer: Yes, the Company is continuously exploring a range of f unding options and has
been successf ul in that area in the past to support project developments. The
directors remain conf ident that suf f icient capital can be raised to meet ongoing
operational needs.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, the Company expects to continue its operations and exploration activities.
Th
Share your feedback
Discover