Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL REPORT
2025
ASX:OD6
ABN: 34 654 839 60
Chair’s Letter
2
Managing Director’s Overview
4
Environmental, Social and Governance
9
Corporate
19
Annual Financial Report
22
Corporate Directory
23
Directors’ Report including Remuneration Report
24
Corporate Governance Statement
34
Auditor’s Independence Declaration
35
Consolidated Statement of Profit or Loss and Other Comprehensive Income
36
Consolidated Statement of Financial Position
37
Consolidated Statement of Changes in Equity
38
Consolidated Statement of Cash Flows
39
Notes to the Financial Statements
40
Directors’ Declaration
58
Independent Auditor’s Report
59
ASX Additional Information
65
Schedule of Mineral Tenements
69
1
CHAIR’S LETTER
Dear Shareholder
It is with great pleasure that I present to you my first letter as Chairman of OD6 Metals following my appointment
earlier this year.
The 2024/25 financial year, has seen OD6 continue to advance our flagship Splinter Rock Rare Earth Project in
Western Australia, along with welcoming the recently acquired Gulf Creek Copper Project, in New South Wales.
Together, these projects underline our commitment to critical minerals that will play a central role in the global
energy transition.
On behalf of the Board of Directors, I would like to acknowledge the Ngadju people, the Esperance Nyungar people,
and the Gomeroi people, the Traditional Owners of the land upon which we work. We pay our respects to the
respective Traditional Owner groups and their elders, past, present and emerging.
I would also like to recognise the Esperance community who have provided significant support to the Company
over the last three years, and more recently the Barraba community in NSW as well.
Splinter Rock Rare Earth Project
Splinter Rock continues to stand out as one of Australia’s most exciting clay-hosted rare earth opportunities.
Already boasting an impressive mineral resource estimate of 682 Mt @ 1,338 TREO at 1,000 ppm cut-off grade,
the Board feels that metallurgy and process development should be our focus. We don’t believe adding tonnes to
an already globally significant resource is the best use of shareholder funds.
Over the past year, we have achieved meaningful progress in metallurgy and process development, particularly
through the application of heap leach extraction techniques. These low-impact, cost-effective methods are
delivering improved recoveries and enhancing the commercial potential of the project.
Working in partnership with ANSTO, we have made further breakthroughs in impurity removal, validating the unique
nature and amenability of our clay-hosted deposits. These achievements position Splinter Rock to deliver a highquality product capable of playing a vital role in the international rare earth supply chain.
Global sentiment for rare earths has strengthened in recent months, as governments and manufacturers
increasingly recognise the importance of securing sustainable supply chains. With its combination of scale,
amenable metallurgy, and advantageous location in a stable mining jurisdiction, Splinter Rock is exceptionally well
positioned to respond to this growing demand.
Gulf Creek Copper Project
One of the exciting developments this year has been the acquisition of the Gulf Creek Copper Project. This
historically significant copper-producing district offers immediate exploration upside and provides strategic
diversification into a commodity critical to decarbonisation, electrification, and the expansion of digital infrastructure.
Our maiden drilling program in early 2025 successfully intersected high-grade copper mineralisation beneath the
historical mine, while confirming the strong correlation between magnetism and massive sulphide mineralisation.
Geophysical modelling has identified multiple high-priority, untested targets, including over 3 km of strike within the
immediate mine sequence and more than 10 km across the broader tenement. These results highlight the potential
for Gulf Creek to become a significant new copper discovery.
2
CHAIR’S LETTER (CONTINUED)
Looking Ahead
The year ahead will be important as we continue to de-risk and advance Splinter Rock, while exploring the exciting
opportunities at Gulf Creek. Our disciplined strategy remains focused on building a portfolio of critical mineral assets
that can deliver long-term value to shareholders, contribute to global supply chains, and support the clean energy
transition.
In closing, I would like to extend my sincere thanks to our shareholders, communities, and stakeholders for their
ongoing support. OD6 enters the coming year with a compelling asset base, strong cash balance, a strengthened
strategy, and a firm commitment to creating value through discovery, innovation, and responsible development.
Piers Lewis
Non-Executive Chair
19 September 2025
3
MANAGING DIRECTOR’S OVERVIEW
Dear Shareholders,
The 2024/25 financial year was one of innovation, and diversification for OD6 Metals. Our strategic focus on critical
minerals positions the Company to benefit from the accelerating global demand for materials that underpin
electrification, energy security, and decarbonisation.
With significant advancements at our flagship Splinter Rock Rare Earth Project and the successful acquisition and
maiden exploration results at the Gulf Creek Copper Project, OD6 enters the new financial year in a strengthened
position, underpinned by two cornerstone assets aligned to the clean energy transition.
Splinter Rock Rare Earth Project (Western Australia)
Our core project, Splinter Rock, continues to set benchmarks within Australia’s clay-hosted rare earths sector. This
past year marked a step-change in the technical maturity of the project, both in resource growth and metallurgical
development.
Mineral Resource Growth
In April 2024, we delivered a significant update to the Mineral Resource Estimate, which now stands at (Refer to
ASX Announcement Mineral Resource Estimate Doubles):
• 682 million tonnes @ 1,338 ppm TREO, including
•
High Grade Inside Cetre Prospect 119 million tonnes @ 1,632 ppm TREO in the Indicated category
•
23% of the resource as high-value Magnet Rare Earth Oxides (Nd+Pr+Dy+Tb)
•
Further Resource growth potential with current resource based on drilling less than 10%of identified clay
basins
This result confirms Splinter Rock as one of the largest and highest-grade clay-hosted REE projects in Australia,
and one of the few with an Indicated resource component, an important step toward future feasibility studies.
4
MANAGING DIRECTOR’S OVERVIEW (CONTINUED)
Figure 1: Centre Mineral Resource shell on the basement model (from AEM data). Oblique view to the north.
Vertical Exaggeration x 5. (Refer to ASX Announcement Mineral Resource Estimate Doubles)
Science-Led Collaboration
Our collaborative approach remains central to our success. A peer-reviewed paper published in Ore Geology
Reviews highlighted the project’s geological significance and reinforced OD6’s reputation for rigorous, sciencebased research. (Refer to ASX Announcement Advanced Geological Research Paper Publication)
Metallurgical Innovation
Metallurgical test work has been a key focus this year, with considerable progress achieved in partnership with
ANSTO. Our flowsheet development continues to demonstrate the technical and economic potential to extract rare
earths using scalable, low-energy processes:
• Heap leach column trials delivered recoveries of up to 80% for key magnet rare earths (Refer to ASX
Announcement Heap Leach Improves Met Recoveries)
•
Nanofiltration (NF) enable over 80% acid recycling and a 69% reduction in liquor volume sent to IX and IR
circuits (Refer to ASX Announcement Nanofiltration Reduces Acid Requirements By Over 80%)
•
Ion Exchange (IX) and Impurity Removal (IR) technologies proved highly effective in impurity removal
(Refer to ASX Announcement IXI Improves Processing Flowsheet)
•
Production of high-quality Mixed Rare Earth Carbonate (MREC) and Mixed Rare Earth Hydroxide (MREH),
both with low impurities and high TREO content of 56-59% (Refer to ASX Announcement High Quality
MREC produced)
•
Product quality meets or exceeds global MREC and MREH benchmarks
These achievements establish OD6 as a frontrunner in the development of a low-cost, flowsheet for clay-hosted
rare earths in Australia.
5
MANAGING DIRECTOR’S OVERVIEW (CONTINUED)
Figure 2: Indicative processing steps including Heap Leach, Nanofiltration plus Ion Exchange & Impurity
Removal
Figure 3: Inside Centre Column Leach REE Recovery by Element (Refer to ASX Announcement Heap Leach
Improves Met Recoveries)
Gulf Creek Copper Project (New South Wales)
In January 2025, OD6 completed the acquisition of the Gulf Creek Copper Project. This volcanogenic massive
sulphide (VMS) style copper-zinc-silver system provides OD6 with strategic exposure to copper, a commodity
increasingly vital to renewable infrastructure, electric vehicles, energy storage and data centres.
Initial Exploration Success
Our fieldwork and data review during late 2024 and early 2025 confirmed multiple mineralised trends within the
Gulf Creek area (Refer to ASX Announcement Rock Chips up to 12.35% Copper and 1.04g/t Gold and ASX
Announcement High-Grade Copper Assays Confirms Potential at Gulf Creek). Highlights included:
• Rock chip sampling up to 12.35% Cu,
•
Extensive historical workings with minimal modern exploration,
•
Geophysical modelling that identified several high-priority magnetic anomalies consistent with VMS
mineralisation (Refer to ASX Announcement New potential high-grade VMS copper targets at Gulf Creek)
Maiden Drilling Program (2025)
Our first drill program delivered highly encouraging results, including:
• 8m @ 1.41% Cu, 1.26% Zn, 7.08 g/t Ag,
•
6m @ 1.32% Cu, 2.82% Zn, 9.02 g/t Ag,
•
1m @ 4.33% Cu, 1.02% Zn, 2.5 g/t Ag.
6
MANAGING DIRECTOR’S OVERVIEW (CONTINUED)
These intercepts confirm high-grade massive sulphide mineralisation and the relationship between magnetism and
massive sulphide mineralisation, validating our geological model (Refer to ASX Announcement High Grade Copper
Massive Sulphides)
Figure 4: Plan view of Gulf Creek drill results
Figure 5: Cross-section through hole GCC0004. Magnetism correlates with copper
7
MANAGING DIRECTOR’S OVERVIEW (CONTINUED)
Expansion
Opportunities
Our geophysical modelling and interpretation have outlined several additional untested target horizons, including
the Big Bend, West Limb, Northwest structures. We anticipate a follow-up Phase 2 drill campaign in FY26 to further
delineate these zones.
Outlook for 2025/26
OD6 enters FY26 with strong momentum and clear priorities:
• Splinter Rock: Scale-up metallurgical testwork, advance study activities, and increase engagement with
government stakeholders and potential offtake partners.
•
Gulf Creek: Execute the Phase 2 drill program to expand the mineralised footprint and accelerate the
project toward resource definition.
Together, these projects place OD6 at the centre of the clean energy materials supply chain, with exposure to both
rare earths and copper — two commodities critical to electrification and global decarbonisation.
Closing Remarks
I would like to thank the Board, our technical teams, advisors, and most importantly our shareholders for their
continued support and confidence. With a clear strategy, a growing asset base and a disciplined approach, OD6 is
well positioned for the year ahead.
Brett Hazelden
Managing Director
19 September 2025
8
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG)
At OD6 Metals, we recognise that responsible stewardship of our environment, meaningful engagement with
communities, and strong governance practices are essential to building a sustainable and successful business. As
an emerging critical minerals company, we are committed to embedding ESG principles into the foundation of our
strategy and operations from the earliest stages of project development.
ESG Committee
OD6 Metals has formalised its sustainability oversight through an ESG Committee and an ESG Committee Charter
under the Corporate Governance Plan (available on OD6’s website). As outlined in the Committee Charter, the
ESG Committee’s main objective is to support and advise the Board in addressing sustainability matters. In FY25,
the ESG Committee met once to review sustainability matters, with additional oversight of ESG matters considered
at Board meetings throughout the year
OD6 Metals has formulated an ESG Policy to guide the Board and employees in minimising adverse sustainability
impacts and ensuring sustainable operations. The policy serves as a framework for the company's activities,
emphasising responsible practices across environmental, social and governance dimensions.
Environmental Responsibility
Our focus on rare earths and copper—minerals essential for the global energy transition—positions OD6 as a
potential contributor to the global energy transition, subject to ongoing environmental and social impact
assessment. In FY25, we continued to prioritise low-impact exploration practices and progress on understanding
the environmental profile of our Splinter Rock Rare Earth Project and Gulf Creek Copper Project.
Social Engagement
We acknowledge that our success is intrinsically linked to the trust and support of the communities in which we
operate. OD6 maintains open and respectful dialogue with landholders, Traditional Owners, regulators, and local
stakeholders across both Western Australia and New South Wales.
Stakeholder Engagement
The Company recognises the importance of meaningful engagement with stakeholders and actively seeks and
incorporates stakeholder feedback into decision-making processes. At this time, such stakeholders include local
communities, First Nation Peoples, landowners, employees, contractors, suppliers, Local Government, State
Government, Federal Government, non-government organisations, investors, community groups and regulatory
bodies. The Company is committed to understanding such stakeholders’ expectations and seeking to address any
concerns.
9
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG)
(CONTINUED)
Stakeholders
How we engaged
Government and
Regulators
Reporting, approvals, licences and permits,
Critical minerals
meetings, briefings, publications and participation in Rare Earth supply
public policy discussions, forums, relationships with Resource management
government ministers and government agencies,
Cultural heritage
letters, emails, formal submissions, website,
Workplace health and safety
participation in industry association and advocacy Climate change
bodies, annual reports including establishment of
Regulatory reform including support for
applicable committees and related activities
new energy and critical minerals sector
Direct engagement, heritage surveys, phone calls, Indigenous engagement and
email, media, meetings, feedback sessions and
procurement
cultural awareness training
Heritage Surveys
Community relationships
First Nation
Peoples
Key Interests and Concerns
Shareholders and Website, investor briefings, annual general
Investors
meetings, emails, annual reports and ASX
announcements and financial reports
Rare earth price and trends
Geological discoveries
Company development
Financial performance
Employees and
Contractors
Implementation of an Employee Assistance
Program
Health, safety and wellness
Esperance based employees
Impacts of fly-in fly-out (FIFO) lifestyle
Company development
Wellbeing
Direct engagement, phone calls, email, media
(including newspaper articles, meetings, events),
website, feedback and local procurement in the
Goldfields / Esperance Regions
Local procurement
First Nation Peoples engagement
OD6 Metals development
Support of Shire of Esperance activities
Communities
SharePoint Hubs, team meetings, site meetings,
induction training and emails
Suppliers/Vendors Direct engagement, phone calls, email, media,
Supply chain opportunities
newspaper, meetings, feedback sessions and
Rising costs
procurement of services locally in accordance with Contract terms
our Local Procurement Policy, adherence to agreed Esperance and Goldfields procurement
terms and conditions and timely payment
Non-government Direct engagement, emails, events, website
Workplace health and safety
organisations
Skills shortage
Development of Australia’s Critical
Minerals Sector
Gender equity
Climate
New legislation
10
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG)
(CONTINUED)
Governance and Risk Management
Strong governance underpins our decision-making and risk management processes.
OD6 Metals embeds business ethics within its operations to maintain responsible practices. The Company’s
Corporate Governance Plan sets forth the principles and expectations for employee business conduct. OD6 Metals
adopts a zero-tolerance approach to bribery and corruption. The Company’s Anti-Bribery and Corruption Policy
sets out the expected business conduct to minimise the risk of bribery or corruption occurring in connection with its
operations and activities. It also provides guidance on how to deal with instances of bribery or corruption.
The Company’s Whistle-Blower Policy outlines reporting channels and investigation processes for corrupt, illegal
or unethical work-related conduct consistent with the whistleblower protections in Part 9.4 AAA of the Corporations
Act 2001 (Cth). It provides employees with assurance that all reports will be taken seriously, treated as confidential
and handled without fear of reprisal. There were no breaches or litigation associated with anti-bribery and corruption
brought to OD6 Metals’ attention during the reporting period.
Risk Management Process
OD6 Metals understands that effective management of risk is a critical aspect of its business, with the potential to
substantially improve the business in a number of ways. Risk management is integral to an efficient and successful
company and forms part of the strategic and operational responsibilities of management.
It is the policy of OD6 Metals to achieve an acceptable industry standard in the management of risks that may
potentially impact the Company, in accordance with the standard risk management framework (AS/NZS ISO
31000). Further, the Company categorises its risk appetite into four categories, Low, Moderate, High and Very
High. OD6 Metals has identified a risk appetite that is acceptable to the organisation.
The Company performs a bi-annual review to ensure that the risks to the business are being managed. The risks
and their categorisation are reviewed periodically by the Audit and Risk Committee, at meetings held during the
year.
The Company’s risk appetite and risk management policy is reflective of its environment (being a listed company),
the nature of the mining industry and the often unpredictable nature of commodities. It is our policy to mitigate risks
in accordance with our framework, where practicable.
All personnel of the Company are recognised as having a role in the identification and management of risks and
are required to participate in that process.
The Company’s risk champions will continue to manage risk even when the risk becomes elevated. Risks that are
ranked High or Very High will be overseen by senior management. At this point the risk will be specifically
highlighted for the Board’s attention, with the board retaining ultimate responsibility for risk oversight.
Risk Management Process
OD6 Metals understands that effective management of risk is a critical aspect of its business, with the potential to
substantially improve the business in a number of ways. Risk management is integral to an efficient and successful
company and forms part of the strategic and operational responsibilities of management.
It is the policy of OD6 Metals to achieve an acceptable industry standard in the management of risks that may
potentially impact the Company, in accordance with the standard risk management framework (AS/NZS ISO
31000). Further, the Company categorises its risk appetite into four categories, Low, Moderate, High and Very
High. OD6 Metals has identified a risk appetite that is acceptable to the organisation.
11
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG)
(CONTINUED)
The Company performs a bi-annual review to ensure that the risks to the business are being managed. The risks
and their categorisation are reviewed periodically by the Audit and Risk Committee, at meetings held during the
year.
The Company’s risk appetite and risk management policy is reflective of its environment (being a listed company),
the nature of the mining industry and the often unpredictable nature of commodities. It is our policy to mitigate risks
in accordance with our framework, where practicable.
All personnel of the Company are recognised as having a role in the identification and management of risks and
are required to participate in that process.
The Company’s risk champions will continue to manage risk even when the risk becomes elevated. Risks that are
ranked High or Very High will be overseen by senior management. At this point the risk will be specifically
highlighted for the Board’s attention, with the board retaining ultimate responsibility for risk oversight.
Risk Factors and Management
The Shares in OD6 Metals are considered highly speculative. An investment in the Company is not risk free. The
proposed future activities of the Company are subject to several risks and other factors which may impact its future
performance. Some of these risks can be mitigated using safeguards and appropriate controls. However, many
of the risks are outside the control of the Directors and management of the Company and cannot be mitigated.
The risks described below are not an exhaustive list of the risks faced by the Company or by investors in the
Company. The risks described below also necessarily include forward looking statements. Actual events may be
materially different to those described and may therefore affect the Company in a different way.
Investors should be aware that the performance of the Company may be affected and the value of its Shares may
rise or fall over any given period. None of the Directors or any person associated with the Company guarantee the
Company's performance, the performance of the Shares or the market price at which the Shares will trade.
Stated Risks
Company’s development plans, the quantum of which remain
unknown at the date of this Annual Report. The Company may seek
to raise further funds through equity or debt financing, joint ventures,
production sharing arrangements or other means. Any additional
equity financing may be dilutive to Shareholders and may be
undertaken at lower prices than the market price. Any debt
financing, if available, may involve restrictions on financing and
operating activities. There can be no assurance that additional
finance will be available when needed. Failure to obtain sufficient
financing for the Company’s activities and future projects may result
in delay and indefinite postponement of exploration, development,
or production on the Company’s Projects or even loss of interest in
the Projects.
Private land, Reserve Land and Land Access Risk
Limited Operation History
The Company is an early stage exploration entity and has limited
operational history on which to evaluate its business and prospects.
The prospects of the Company must be considered in light of the
risks, expenses and difficulties frequently encountered by
companies in the early stages of their development, particularly in
the mineral exploration sector, which has a high level of inherent
risk and uncertainty. No assurance can be given that the Company
will achieve commercial viability through the successful exploration
on, or mining development of, the Projects or any other mining
assets it has an interest in. Until the Company is able to realise
value from the Projects or such mining assets, it is likely to incur
operational losses.
The Company's interests in the Tenements are subject to
Commonwealth and applicable state legislation and cannot be
guaranteed. The Company may be required to obtain the consent
of and / or compensate holders of third-party interests which overlay
areas within the Tenements. The Tenements overlap certain thirdparty interests that may limit the Company's ability to conduct
exploration activities including Crown land, proposed Crown
reserves, pastoral leases and areas covered by native title
determinations. The Grass Patch Project, comprising exploration
licences E63/2151, E63/2152, E63/2154 and E63/2185 falls
principally on private agricultural land that is intersected by multiple
road reserves. The Company has applied for and obtained, permits
Future Capital Requirements
The Company is an exploration company and currently has no
operating revenue and is unlikely to generate any operational
revenue unless the Company’s tenements are successfully
developed and exploited. The future capital requirements of the
Company will depend on many factors including its business
development activities. Should the Company consider that its
exploration results justify commencement of production on any of its
Projects, additional funding will be required to implement the
12
ENVIRONMENTAL, SOCIAL AND GOVERNANCE (ESG)
(CONTINUED)
from the Shire of Esperance to conduct exploratory drilling within
the road reserves and expects to be able to proceed with initial
exploration on the Grass Patch Project without the need for private
land access agreements. Should substantial discovery be made,
however, the Company will need to obtain the consent of any
relevant private land owners and occupiers. This typically involves
negotiating land access agreements with those parties which will
likely require the Company to pay compensation to those parties for
any exploration activities undertaken on it. Once this consent is
obtained, the Company can apply to the Minister for Mines and
Petroleum to obtain the right to access the top 30 metres of its
exploration licences which encroach on private land. Any delays in
respect of conflicting third-party rights, obtaining necessary
consents, or compensation obligations, may adversely impact the
Company's ability to carry out exploration activities within the
affected areas.
including project delays and costs overruns. If the Company
experiences project delays or cost overruns, this could result in the
Company not realising its operational or development plans or result
in such plans costing more than expected or taking longer to realise
than expected.
Nature of Mineral Exploration
The Company has not published resource estimates for any
prospects. There is no assurance that exploration or project studies
by the Company will result in the definition of an economically viable
mineral deposit.
Furthermore, resource estimates are expressions of judgement
based on knowledge, experience and industry practice. Estimates
which were valid when originally calculated may alter significantly
when new information or technologies become available. In
addition, by their very nature, resource estimates are imprecise and
depend to some extent on interpretations, which may prove to be
inaccurate and require adjustment. As further information becomes
available through additional fieldwork and analysis, the estimates
are likely to change. This may result in alterations to development
and mining plans which may, in turn, adversely affect the
Company’s operations.
Inclement Weather and Natural Disasters
The Company's operational activities are subject to a variety of risks
and hazards which are beyond its control, including hazardous
weather conditions such as excessive rain, flooding and fires. Any
of the above occurrences will impact the Company’s ability to realise
its operational or developmental plans and may negatively impact
profitability.
Resource Estimates May Be Inaccurate
Mineral exploration and development is considered a high-risk
undertaking. There is no guarantee that exploration of the Projects
will result in the discovery of an economically viable resource. Even
if an apparently viable resource is discovered, there is no guarantee
that the resource can be economically exploited.
Exploration on the Company’s Projects may be unsuccessful,
resulting in a reduction of the value of those Projects, diminution in
the cash reserves of the Company and possible relinquishment of
such Projects.
The proposed exploration costs on the Projects are based on certain
assumptions with respect to the method and timing of exploration.
By their nature, these estimates and assumptions are subject to
significant uncertainties and, accordingly, the actual costs may
materially differ from these estimates and assumptions.
Accordingly, no assurance can be given that the cost estimates and
the underlying assumptions will be realised in practice which may
materially and adversely affect the Company’s ability to complete
the exploration programs as planned.
Development Risk
The business of exploration, project development and mining
contains risks by its very nature. To prosper, it depends on the
successful exploration or acquisition of reserves, design and
construction of efficient production and processing facilities,
competent operation and managerial performance and proficient
marketing of the product. In particular, exploration is a speculative
endeavour and force majeure circumstances, cost over runs and
other unforeseen events can hamper mining operations.
Metallurgy
Metal and / or mineral recoveries are dependent upon the
metallurgical process that is required to liberate economic minerals
and produce a saleable product and by nature contain elements of
significant risk such as:
- identifying a metallurgical process through test work to
produce a saleable metal and / or concentrate
- developing an economic process route to produce a metal and
/ or concentrate; and
- changes in mineralogy in the ore