Quarterly Activities and Cashflow Report
OD6 Metals Limited (OD6 or the Company) is pleased to present its Quarterly
Activities and Cashflow Report for the period ending 31 March 2025
Highlights (including subsequent events):
Gulf Creek Copper Project, NSW
â˘
Acquisition of Historic High-Grade CopperâZinc VMS style project completed
â˘
Rock chip assays up to 12.35% Cu and 1.04g/t gold found in samples collect from ongoing
reconnaissance, including up to 1.98% Cu & 0.57% Zn at Murchison Copper Workings located 1.8km
north of Gulf Creek
â˘
New geochemical and geophysical surveys continued to confirm and expand on the multiple high
priority, extensional and repeat targets across the Gulf Creek tenure
â˘
Maiden Drill program occurred with 1,113m drilled across 6 drill holes. The program planned to complete
~2,000m across 9 holes but was ceased early as directed by the NSW Resource Regulator
â˘
Assay results are due during Q2 2025
Splinter Rock, WA
â˘
Phase 4 ANSTO Metallurgical Tests at the Splinter Rock Project continued during the quarter
Corporate
â˘
$1.17M placement completed
â˘
Half Year Financial Report Issued
â˘
General Meeting of Shareholders Held
â˘
Cash balance at the end of the March quarter remains strong at A$1.86M
Brett Hazelden, Managing Director, commented:
âIt has been another busy quarter at OD6, with a few unexpected twists and turns surrounding our Maiden Drill
Program at Gulf Creek. While it was disappointing to have the NSW Resource Regulator cease works part way
through the drilling activities with 6 of the 9 holes completed, the Company is continuing to cooperate with the
Regulator. At this time the Company cannot provide any further update on the timing or potential outcomes of the
Regulatorâs investigations, nor potential recommencement of onsite exploration activities at the Gulf Creek Copper
Project, and will update the market in due course, in compliance with its continuous disclosure obligations.
We are eagerly awaiting the assays from the six completed drill holes which will inform our ongoing exploration
drill programs associated with both the brownfield area at the historic Gulf Creek Mining Area, and the greenfield
opportunities at the potential repeat structures already identified.
It is pleasing to see a resurgence in Rare Earth prices and interest return to the sector. OD6 in conjunction with
ANSTO have continued to optimise the metallurgical impurity removal process which continues to have positive
outcomes with multiple potential pathways continuing to be reviewed. Results are due during the first half of 2025.â
1
Exploration and Development (including subsequent events)
Acquisition of
On 20 October 2024 (refer ASX release and presentation), the Company announced the
Historic Gulf
proposed acquisition of the Historic Gulf Creek Copper Projectâa high grade volcanogenic
Creek Copper
massive sulphide (VMS) project located near the town of Barraba in New South Wales (the
Mine
Gulf Creek Project). Highlights of the acquisition include:
â˘
High-Grade CopperâZinc VMS style deposit â historic underground mining
averaged 2 to 6.5% Cu1
â˘
Mined over 100 years ago (1896-1912) - with +100m vertical and +300m strike
open in multiple directions
â˘
Mineralisation is associated with magnetite with geophysics showing repeat
structures to the north and west of existing Gulf Creek workings
â˘
Significant greenfields and brownfields exploration potential with over >3km
of untested strike in the immediate mine-stratigraphy, and over >10km across
the tenement
â˘
Favourable deal metrics and structure based on $200k cash, and 6,000,000 shares,
plus a deferred issue of $200k shares (subject to shareholder approval) or cash on
commencement of Phase 2 drill program
â˘
Fully permitted Phase 1 drill program around the historical workings in place
Completion of the acquisition was announced on 15 January 2025 (refer ASX release).
Rock Chips up to During the quarter on 16 January 2025 (refer ASX release), OD6 reported surface rock-chip
12% Copper
assay results collected from further recent reconnaissance at Gulf Creek. Highlights included:
â˘
Up to 12.35% Cu in weathered malachite bearing sediments (Gulf Creek)
â˘
Up to 11.60% Cu, 0.27g/t Au, 29.8g/t Ag assayed in banded massive sulphides
(Gulf Creek)
â˘
Up to 1.04g/t Au with 1.33% Cu in gossan (Gulf Creek)
â˘
Up to 1.98% Cu & 0.57% Zn at Murchison Copper Workings located 1.8km north
of Gulf Creek
â˘
Up to 335ppm Cu from silica-cap/chert near the Big Bend target area indicating
potential at depth
The Competent Person cautions that while the Mines Department records in this instance have been collected in accordance with official
provisions at the time, they are not absolute measures of the tenor or quantity of mineralisation. The Competent Person considers that these
records provide a reasonable indication of the tenor of grades and potential volumes of mineralisation present.
1
2
Geophysical and During the quarter on 19 February 2025 (refer ASX release), OD6 reported surface soil
Geochemical
Expand Targets
sampling and results from the Fixed Loop Electromagnetics (FLEM) geophysics survey.
â˘
New geochemical and geophysical surveys continued to confirm and expand on
the multiple high priority, extensional and repeat targets across the Gulf Creek
tenure
â˘
Anomalous copper and path finder soil anomalies extend over several
kilometres, supporting evidence of a large-scale and potential high-grade VMS
style system
â˘
Multiple conductors identified in FLEM geophysical survey many of which are
coincident with existing targets, but also support new high priority drill targets
â˘
Separate Au-Bi-Se-Mo anomaly indicating possible intrusion related mineral
system (eg gold) target to the north east of the historical high-grade Gulf Creek
mine
Figure 1: Gulf Creek Soil Program (background shading is Cu in soil)
3
Figure 1 Gulf Creek Soil Program (background shading = first vertical derivative magnetics)
Maiden Drilling
During the quarter OD6 the maiden drilling program commenced at Gulf Creek (refer ASX
Undertaken at
release). The drill program was focused on the historic workings and aimed to test the
Gulf Creek
continuity of the known high-grade mineralisation and VMS structures.
The program originally planned to complete ~2,000m across 9 holes.
1,113m were drilled across 6 drill holes prior to the programmed being ceased early as
directed by the NSW Resource Regulator (refer ASX releases 12 March 2025, 21 March 2025
and 21 March 2025).
The Company is cooperating with the Regulator and, together with its advisors, is assessing
the materiality and factual basis of the potential non-compliances raised. The Company is
actively seeking appropriate advice to determine its position. The Company cannot currently
provide any further update on the timing or potential outcomes of the Regulatorâs
investigations, nor potential recommencement of onsite exploration activities at the Gulf
Creek Copper Project, and will update the market in due course, in compliance with its
continuous disclosure obligations
Assay results are due during Q2 2025
4
Phase 4 ANSTO
Phase 4 metallurgical testing continued at ANSTO during the quarter. The focus of the
Rare Earth
works is summarised below and is largely now focused on samples originating from
Metallurgical
multiple holes at Inside Centre and Prop, based on heap leach liquors.
Tests Ongoing
â˘
Impurity Removal Trials: Conduct impurity removal trials under various pH
conditions, temperatures, and with different reagents.
â˘
Assessment of Resin Use: Evaluate the potential use of resins in both pulp and liquid
phases to assist in impurity removal.
â˘
Ion Exchange Assessment: Assess ion exchange processes on "leach" liquor and
investigate selective elution of REE versus impurities such as Al and Fe.
â˘
Nanofiltration Evaluation: Evaluate nanofiltration processes to produce a retentate
with increased REE concentration and a permeate containing clean acid for recycling.
â˘
Mixed Rare Earth Precipitation: Investigate mixed rare earth precipitation methods,
including carbonates and hydroxides.
Corporate
Successful
Placement
The company completed a A$1.17M placement (before costs) on the 12 February 2025
(refer ASX release). The Placement comprised the issue of 26,000,000 new fully paid
ordinary shares (New Shares) at the issue price of 4.5 cents per New Share. Investors will
receive one (1) free attaching option exercisable at 6.5 cents per share with an expiration
date of three (3) years from allotment date, for every two (2) New Shares subscribed for
under the Placement (âAttaching Optionsâ).
Half Year
Report
OD6 Metals issued its Half Year Accounts to Shareholders to the ASX on 7 March 2025
General
Meeting
OD6 Metals held a General Meeting (GM) of shareholders on 9 April 2025.
Director
Resignation
(refer ASX release).
Please refer to the following ASX Announcements:
â˘
Results of Meeting, 9 April 2025
â˘
Notice of Meeting, 4 March 2025
Mr Wayne Bramwell stepped down as Non-Executive Chair of the Company, retiring from
the Board effective 31 January 2025 due to increasing commitments associated with his
executive and industry body commitments. Founding Chair and current Non-Executive
Director Darren Holden will reassume the Non-Executive Chair role of the Company (refer
ASX release).
Cash Holdings
The Company had A$1.86M million of cash on hand as at 31 March 2025
5
Securities on
Issue
Fully Paid Ordinary Shares
159,245,728 (as at 31 March 2025)
Performance rights
OPTIONS
2,800,000
43,250,371
Options on issue comprise:
⢠22,050,371 Founder Options exercisable at A$0.30 on or before 31 October 2025.
â˘
3,850,000 Incentive Options exercisable at A$0.30 on or before 31 March 2026.
â˘
300,000 Contractor Options exercisable at A$0.30 on or before 13 April 2025 (these have
subsequently been removed from the register).
â˘
1,500,000 Performance Options exercisable at A$0.50 on or before 31 March 2026.
â˘
2,500,000 Lead Manager Options exercisable at A$0.30 on or before 20 June 2025.
â˘
900,000 Performance Options exercisable at A$0.30 on or before 09 October 2026
â˘
2,650,000 Incentive Options exercisable at A$0.27 on or before 08 December 2026.
â˘
5,000,000 Broker Options exercisable at A$0.114 on or before 9 May 2027.
â˘
4,500,000 New Chair Options exercisable at $0.10 on or before 5 December 2027
The Company has obtained shareholder approval at the General Meeting to issue the
following securities, which are expected to be issued prior to 9 May 2025.
⢠Issue 12,277,778 Unlisted Options exercisable at $0.06 (expire 3 years from issue) to
Placement participants;
â˘
Issue up to 1,444,445 shares and 722,223 Unlisted Options exercisable at $0.06 (expire 3
years from issue) to Directors participating in the Placement; and
â˘
Issue 8,000,000 Unlisted Options to advisors exercisable at $0.06 (expire 3 years
from issue).
At 31 March 2025 none of the performance milestones of the Performance Rights still on
issue have been met, nor had any shares been issued on conversion of Performance Rights.
A summary of the performance milestones is outlined below:
CLASS
NUMBER
MILESTONE
EXPIRY DATE
B
1,500,000
Upon completion of a scoping study on a Project (prepared
in accordance with the guidelines prescribed by the JORC
Code and independently verified by an independent
competent person under the JORC Code) that
demonstrates an internal rate of return (IRR) of more than
20%.
22 June 2025
C
1,000,000
The Company announcing to ASX a JORC Code Compliant
inferred (or greater) Mineral Resource (as defined in the
JORC Code) of not less than 1,000,000,000 tonnes (of which
at least 400,000,000 tonnes must be an indicated Mineral
Resource), grading a minimum of 1000 ppm total rare earth
oxides (TREO).
08 December
2026
D
300,000
The rights vest on the Company announcing to ASX the
results of a Scoping Study (as defined in the JORC Code)
showing the potential to generate an internal rate of return
08 December
2026
6
(IRR) of more than 20% using consensus prices and Board
approved assumptions.
Borrowings
The Company has no borrowings.
Expenditure
Exploration
Exploration and Evaluation expenditure during the quarter was A$353k. Expenditure
Expenditure
included site visits, ANSTO metallurgical testing, mineralogy and geological investigation.
Related Party
During the quarter ended 31 March 2025 payments to related parties amounted to A$166k,
Transactions
comprising of Managing Director Fees, Non-Executive Director fees, Superannuation and
geological consulting fees to GeoSpy Pty Ltd, which is an entity controlled by Darren
Holden.
Mineral Interests
Exploration
During the quarter OD6 acquired the license (EL 8492) over the historic Gulf Creek Copper
Tenements
mine and its surrounding area, in NSW.
Schedule of Exploration Licenses (E) held end of March 2025 Quarter.
PROJECT
TENEMENT
NUMBER
HOLDER
STATUS
GRANTED
OWNERSHIP
Gulf Creek
EL 8492
Gulf Creek Copper Pty Ltd
Granted
7 Jan 25
100%
Splinter Rock
E 63/2115
Odette Six Pty Ltd
Granted
4 Feb 22
100%
Splinter Rock
E 69/3904
Odette Six Pty Ltd
Granted
15 Feb 22
100%
Splinter Rock
E 69/3905
Odette Six Pty Ltd
Granted
15 Feb 22
100%
Splinter Rock
E 69/3907
Odette Six Pty Ltd
Granted
14 Feb 22
100%
Splinter Rock
E 69/3893
Odette Six Pty Ltd
Granted
20 Jan 22
100%
Splinter Rock
E 69/3894
Odette Six Pty Ltd
Granted
20 Jan 22
100%
7
ASX Announcements (including Subsequent Events)
This Quarterly Activities Report contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the âAustralasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reservesâ (2012 JORC Code). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the
following announcements lodged on the ASX:
09/04/2025 Results of Meeting
21/03/2025 Response to ASX Aware Letter
21/03/2025 Gulf Creek Copper Project â Clarification and Further Update
12/03/2025 Exploration Update â Gulf Creek Copper Project
07/03/2025 Half Year Accounts
04/03/2025 Notice of General Meeting / Proxy Form
24/02/2025 Ceasing to be a substantial holder
24/02/2025 Ceasing to be a substantial holder
24/02/2025 Ceasing to be a substantial holder
24/02/2025 Maiden Drill Program Underway at Gulf Creek Copper Project
19/02/2025 Cleansing Notice
19/02/2025 Application for quotation of securities â OD6
19/02/2025 Geochemical & Geophysical Surveys Expand Drill Targets
12/02/2025 Investor Presentation
12/02/2025 Proposed Isse of Securities
12/02/2025 Proposed Isse of Securities
12/02/2025 Successful Placement to Accelerate Gulf Creek Copper Project
10/02/2025 Trading Halt
03/02/2025 Final Directors Interest Notice
03/02/2025 Director Resignation
30/01/2025 Quarterly Activities/Appendix 5B Cash Flow Report
17/01/2025 Cleansing Notice
16/01/2025 Rock Chips up to 12.35% Cu & 1.04g/t Au from Gulf Creek
15/01/2025 Application for quotation of securities - OD6
15/01/2025 Completion of Acquisition of Gulf Creek Copper Project
08/01/2025 Geophysical and Geochemical Surveys Commenced at Gulf Creek
These announcements are available for viewing on the Companyâs website https://www.od6metals.com.au/.
OD6 confirms that it is not aware of any new information or data that materially affects the information
included in any original ASX announcement.
8
Forward Looking Statements
Certain information in this document refers to the intentions of OD6 Metals, however these are not intended to
be forecasts, forward looking statements, or statements about the future matters for the purposes of the
Corporations Act or any other applicable law. Statements regarding plans with respect to OD6 Metals projects
are forward looking statements and can generally be identified by the use of words such as âprojectâ, âforeseeâ,
âplanâ, âexpectâ, âaimâ, âintendâ, âanticipateâ, âbelieveâ, âestimateâ, âmayâ, âshouldâ, âwillâ or similar expressions. There
can be no assurance that the OD6 Metals plans for its projects will proceed as expected and there can be no
assurance of future events which are subject to risk, uncertainties and other actions that may cause OD6 Metals
actual results, performance, or achievements to differ from those referred to in this document. While the
information contained in this document has been prepared in good faith, there can be given no assurance or
guarantee that the occurrence of these events referred to in the document will occur as contemplated.
Accordingly, to the maximum extent permitted by law, OD6 Metals and any of its affiliates and their directors,
officers, employees, agents and advisors disclaim any liability whether direct or indirect, express or limited,
contractual, tortuous, statutory or otherwise, in respect of, the accuracy, reliability or completeness of the
information in this document, or likelihood of fulfilment of any forward-looking statement or any event or
results expressed or implied in any forward-looking statement; and do not make any representation or warranty,
express or implied, as to the accuracy, reliability or completeness of the information in this document, or
likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any
forward-looking statement; and disclaim all responsibility and liability for these forward-looking statements
(including, without limitation, liability for negligence).
No new information
Except where explicitly stated, this announcement contains references to prior exploration results, all of which
have been cross-referenced to previous market announcements made by the Company. The Company confirms
that it is not aware of any new information or data that materially affects the information included in the
relevant market announcements.
The information in this report relating to the Mineral Resource estimate for the Splinter Rock Project is extracted
from the Companyâs ASX announcements dated 18 July 2024. OD6 confirms that it is not aware of any new
information or data that materially affects the information included in the original announcement and that all
material assumptions and technical parameters underpinning the Mineral Resource estimate continue to apply.
This announcement has been authorised for release by the Board of OD6 Metals Limited
9
About OD6 Metals
OD6 Metals is an Australian public company pursuing exploration and development opportunities within the critical minerals
sector, namely rare earths and copper.
Copper
The Company is advancing the recently acquired Gulf Creek Copper-Zinc VMS Project located near the town of Barraba in
NSW, Australia.
Gulf Creek was mined at around the turn of the 20th century and was once regarded as the highest grade copper mine (2%
to 6.5% Cu) in NSW until its closure due to weak copper prices in 1912. Very little exploration has occurred at the project in
over 100 years, with OD6 aiming to apply modern day exploration technologies.
Mineralisation is associated with magnetite, with geophysics showing significant greenfields and brownfields exploration
potential exists with over >3km of untested strike in the immediate mine-stratigraphy, and over >10km across the tenement.
Rare Earth Elements
OD6 Metals has successfully identified clay hosted rare earths at its 100% owned Splinter Rock Project which is located in
the Esperance-Goldfields region of Western Australia.
The Company released a Mineral Resource Estimate (MRE) for Splinter Rock in May 2024, confirming that the project hosts
on of the largest and highest-grade clay-hosted rare earths deposit in Australia with an Indicated Resource of 119Mt @
1,632ppm TREO and an Inferred Resource of 563Mt @ 1,275ppm TREO with an overall ratio of ~23% high-value Magnetic
Rare Earths (MagREE).
OD6 Metals believes that Splinter Rock has all the hallmarks of a world class rare earths project with a conceptual
development which utilises the large and high-grade Splinter Rock resource to support a long-life REE operation supported
by a low strip ratio
Corporate Directory
Managing Director
Mr Brett Hazelden
Non-Executive Chair
Dr Darren Holden
Non-Executive Director
Mr Piers Lewis
Non-Executive Director
Dr Mitch Loan
Financial Controller/ Joint Company Secretary
Mr Troy Cavanagh
Joint Company Secretary
Mr Joel Ives
Contact
Investor Relations
OD6 Metals Ltd
Lucas Robinson
ACN 654 839 602
Corporate Storytime
www.od6metals.com.au
lucas@corporatestorytime.com
Mail to: info@od6metals.com.au
Phone: +61 408 228 889
Phone: +61 8 6189 8515
Level 1, 50 Kings Park Road, West Perth, WA 6005
10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
OD6 Metals Limited
ABN
Quarter ended (âcurrent quarterâ)
34 654 839 602
31 March 2025
Consolidated statement of cash flows
Current quarter
$Aâ000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$Aâ000
-
-
(45)
(175)
(b) development
-
-
(c) production
-
-
(d) staff costs
(102)
(295)
(e) administration and corporate costs
(164)
(612)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
6
47
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (refund of tenement application fees)
-
31
1.9
Net cash from / (used in) operating
activities
(305)
(1,004)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(258)
(267)
-
(2)
(352)
(771)
(e) investments
-
-
(f)
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$Aâ000
Year to date
(9 months)
$Aâ000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (R&D Tax refund and Government
grants)
-
620
2.6
Net cash from / (used in) investing
activities
(610)
(420)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
1,105
1,105
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(75)
(145)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
1,030
960
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,746
2,325
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(305)
(1,004)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(610)
(420)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,030
960
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$Aâ000
Year to date
(9 months)
$Aâ000
-
-
1,861
1,861
Current quarter
$Aâ000
Previous quarter
$Aâ000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,861
1,746
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,861
1,746
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
101
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
65
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term âfacilityâ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$Aâ000
Amount drawn at
quarter end
$Aâ000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(305)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(352)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(657)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,861
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$Aâ000
1,861
2.8
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as âN/Aâ.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
29 April 2025
Authorised by: The Board of Directors
(Name of body or officer authorising release â see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entityâs activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: âBy the boardâ.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: âBy the
[name of board committee â eg Audit and Risk Committee]â. If it has been authorised for release to the market by a
disclosure committee, you can insert here: âBy the Disclosure Committeeâ.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Councilâs Corporate Governance Principles and
Recommendations, the board should have received a
Share your feedback
Discover